Download Metrix 4.2 Now!

Abraxas FAQs

Bill Register [Print View]
Q: Why do I need "0.0" placeholders for missing bills?

A:  This goes back to how the baseline is calculated. The regression equation (displayed at the bottom of the tuning tab in blue) has a # of days multiplier. Metrix uses the number of days between bill dates. So, imagine there was a typo in the year of the last bill; instead of 2008 it was 2009. The baseline value for that last month would have a 365 day multipler, rather than something closer to 30 days.

You can easily avoid this error by running quality control. Bills with abnormal durration will show up as warnings.


MetrixMarketManagerReportMaker

Helpful Links:

  Energy Site Index | Contact Us | Link Building | FAQ Engine
Copyright 2001-2010 Abraxas Energy Consulting, LLC. All Rights Reserved.
This is used to preload a background image