Download Metrix 4.2 Now!

Abraxas FAQs

FAQ Search:

« Back to FAQs Main Page

QuestionsDate Answered
My building area changes but my baseline calculation does not reflect this. How do I take into account this modification? 2009-01-21
How should I add a bill-match if my tuning period is less than 365 days? 2003-11-26
Billmatching: If I chose to use the 2nd year of bill data as my baseline, must I delete the first year's information from the modification register? (Thus the first month on my register would be the first month in my baseline.) 2003-11-26
What is wrong with the modification data form? 2003-11-26
What should I do about new construction or renovations during the performance period? 2003-11-26
How does Metrix replicate data in the Factor History Form (Bill Matching)? 2003-11-26
Since Metrix can only replicate one years' worth of data, is there a way to replicate two years worth of data? 2003-11-26
How do I deal with gaps in bills, and how does this affect modifications? 2003-11-26
Why did data disappear from Factor History? 2003-11-26
What does the number in the bottom left corner of the Modifications form do? 2003-11-26
MetrixMarketManagerReportMaker

Helpful Links:

  Energy Site Index | Contact Us | Link Building | FAQ Engine
Copyright 2001-2010 Abraxas Energy Consulting, LLC. All Rights Reserved.
This is used to preload a background image