Home »
Contact Us »
Search »
User Login
Products
Overview
Metrix 4
EnergyCAP
MarketManager
FastData Deluxe
Energy Simulation Handbook
Shopping Cart
Services
Overview
LEED Services
Retro-Commissioning
Training
Online Seminars
Utility Auditing
Technical Support
Building Energy Audits
Resources
Energy Toolbox
Metrix 4 Tutorial
Frequently Asked Questions
Articles
Paper 1
» Englightened Approach to Budgeting and Goal Setting for the Energy Manager
Paper 2
» An Energy Manager's Introduction to Weather Normalization of Utility Bills
Paper 3
» Introduction to Weather Normalization of Utility Bills for Alternative Energy Contractors
Paper 4
» Three Powerful Utility Bill Analysis Methods for the Energy Manager
Paper 5
» A Facility Manager's Intro to Weather Correction for Utility Bill Tracking
Paper 6
» Avina on Emissions Tracking
Paper 7
» The Guide to Choosing the Best Desktop Utility Bill Tracking Software for Your Company
Paper 8
» How to Avoid Energy Audit Disasters: A Guide to Picking a Quality Energy Auditor
Metrix Weather Data
Metrix Modeled Rates
Forums
Shopping Cart
Conversion Calculators
Emissions Calculator
HVAC Rules of Thumb
HVAC Acronym List
Useful Links
Downloads
Metrix
MarketManager
About Us
About Us
Contact Us
Federal Government
Customer List
Join Our Team!
Abraxas FAQs
FAQ Search:
« Back to FAQs Main Page
Questions
Date Answered
My baseline cost seems incorrect. Why is this happening?
2009-01-05
Everyone uses blended rates, when do they fail?
2009-01-05
When rates change in the middle of a given billing period, how does Metrix calculate dollar amounts?
2003-11-26
How do I input a rate in which the demand charge is prorated by number of billing days?
2003-11-26
What are non-standard rates in Metrix and How can I use them?
2003-11-26
Can I make global changes to fuel adjustments?
2003-11-26
One of my Utility Rates used: Effective Date = 1/1/1900, Effective Thru = 12/26/1997. The Rates report listed "Rate applies from Jan 1. 2000 to Dec 26. 1997". Same problem for an Effecitve Date of 1/1/1921. If the Effective Date is set to 1951, then the Rates report correctly lists it as 1951 instead of 2051. Is this a Y2K problem?
2003-11-26
How do you add a charge (to a Rate) that varies from month to month?
2003-11-26
Metrix has charge types for consumption, demand and RkVAh, but not kVA. How do you model kVA demand?
2003-11-26
Many performance contracts stipulate that savings will be calculated at current energy rates unless they fall below base period rates, in which case base period rates are used. How can you configure Metrix to do this?
2003-11-26
What is wrong with my rate?
2003-11-26
There was a rate increase on a project that I am working on. How do I account for this?
2003-11-26
Metrix is prorating bills that straddle the summer and winter seasons. My utility does not prorate, but assigns the entire bill to the season in which the bill end date lands. How can I get Metrix to report costs for months that straddle the two seasons?
2003-11-26
Metrix
MarketManager
ReportMaker
Baseline (2)
Bill Matching (3)
Bill Register (7)
Computer ID (3)
Conversion Factors (5)
Export (4)
Import (5)
Installation (4)
Licensing (11)
Measures (4)
Modifications (10)
Network Issues (4)
Quality Control Errors / Warnings (6)
Rates (13)
Troubleshooting Your Project (5)
Tuning (23)
Variables (1)
Weather (4)
Cooling Equipment (7)
Diagnostics (8)
Domestic Hot Water (1)
Envelope (5)
Fans (1)
Functionality (1)
Heating and Cooling Equipment (4)
Heating Equipment (5)
Loads and Sizing (11)
Modeling HVAC Systems (14)
Pumps (1)
Results (9)
Error Messages (3)
Exporting (1)
Installation (1)
Licensing (1)
Reporting (11)
Helpful Links:
Energy Site Index
|
Contact Us
|
Link Building
|
FAQ Engine
Copyright 2001-2010
Abraxas Energy Consulting, LLC
. All Rights Reserved.