1

Topic: How do you upgrade Metrix 3 projects to Metrix 4?

I was wondering, do we have to pay someone to upgrade our metrix projects to Metrix 4? I sure hope not.

2

Re: How do you upgrade Metrix 3 projects to Metrix 4?

You don't have to pay to upgrade MX3 projects to MX4. You can do it yourself.
In earlier versions of MX4, there were several issues associated with the upgrade, but now almost all of them are gone.

When you do the upgrade, be sure to do this:

1. Make a Base - SimActual Report in MX3, and do the same in MX4, and compare the numbers at the project level.
2. If they are not the same, repeat (1) at the site level
3. If they are not the same, repeat (1) at the meter level.
4. Find the meter(s) which don't correspond.
5. Let us know. Send the projects that don't correspond, tell us which meters, and we will investigate.

All the best,

John Avina